Project references — group 194
100 references shown
- Traffic Concentration — Material Movement Required in Rehabilitation
Reference 31910 · traffic concentration
- Construction Sequencing — Material Movement Required in Public Works
Reference 31911 · construction sequencing
- Rough Excavation Left Unfinished — Material Movement Required in Renewable Energy
Reference 31912 · rough excavation left unfinished
- Dozer Grade Left Unfinished — Material Movement Required in Farm
Reference 31913 · dozer grade left unfinished
- Truck Fill Not Redistributed — Material Movement Required in Irrigation
Reference 31914 · truck fill not redistributed
- Poor Transition Between Grades — Material Movement Required in Civil Site
Reference 31915 · poor transition between grades
- Soil Moisture Condition — Material Movement Required in Road
Reference 31916 · soil moisture condition
- Hard Clay — Material Movement Required in Building Pad
Reference 31917 · hard clay
- Root Interference — Material Movement Required in Industrial Site
Reference 31918 · root interference
- Material Segregation — Material Movement Required in Landscape
Reference 31919 · material segregation
- Settlement After Construction — Material Movement Required in Sports Turf
Reference 31920 · settlement after construction
- Erosion After Rainfall — Material Movement Required in Rural Infrastructure
Reference 31921 · erosion after rainfall
- Flood Scour — Material Movement Required in Rehabilitation
Reference 31922 · flood scour
- Wheel Rutting — Material Movement Required in Public Works
Reference 31923 · wheel rutting
- Road Corrugation Development — Material Movement Required in Renewable Energy
Reference 31924 · road corrugation development
- Topsoil Redistribution Error — Material Movement Required in Farm
Reference 31925 · topsoil redistribution error
- Trench Backfill Settlement — Material Movement Required in Irrigation
Reference 31926 · trench backfill settlement
- Poor Maintenance Timing — Material Movement Required in Civil Site
Reference 31927 · poor maintenance timing
- Surface Not Verified Before Handover — Material Movement Required in Road
Reference 31928 · surface not verified before handover
- Machine Control Setup Error — Material Movement Required in Building Pad
Reference 31929 · machine control setup error
- Survey/Design Mismatch — Material Movement Required in Industrial Site
Reference 31930 · survey/design mismatch
- Wrong Design Elevation — Material Movement Required in Landscape
Reference 31931 · wrong design elevation
- Wrong Benchmark/Reference — Material Movement Required in Sports Turf
Reference 31932 · wrong benchmark/reference
- Excessive Haul Inefficiency — Material Movement Required in Rural Infrastructure
Reference 31933 · excessive haul inefficiency
- Dragging Material Too Far — Material Movement Required in Rehabilitation
Reference 31934 · dragging material too far
- Insufficient Material Carrying — Material Movement Required in Public Works
Reference 31935 · insufficient material carrying
- Repeated Rework Between Trades — Material Movement Required in Renewable Energy
Reference 31936 · repeated rework between trades
- Incorrect Original Grade — Cut Requirement in Farm
Reference 31937 · incorrect original grade
- Insufficient Fall — Cut Requirement in Irrigation
Reference 31938 · insufficient fall
- Excessive Fall — Cut Requirement in Civil Site
Reference 31939 · excessive fall
- Poor Crossfall — Cut Requirement in Road
Reference 31940 · poor crossfall
- Poor Cut Fill Balance — Cut Requirement in Building Pad
Reference 31941 · poor cut fill balance
- Fill Placed In Wrong Location — Cut Requirement in Industrial Site
Reference 31942 · fill placed in wrong location
- Uneven Material Thickness — Cut Requirement in Landscape
Reference 31943 · uneven material thickness
- Inadequate Drainage Path — Cut Requirement in Sports Turf
Reference 31944 · inadequate drainage path
- Blocked Outlet — Cut Requirement in Rural Infrastructure
Reference 31945 · blocked outlet
- Traffic Concentration — Cut Requirement in Rehabilitation
Reference 31946 · traffic concentration
- Construction Sequencing — Cut Requirement in Public Works
Reference 31947 · construction sequencing
- Rough Excavation Left Unfinished — Cut Requirement in Renewable Energy
Reference 31948 · rough excavation left unfinished
- Dozer Grade Left Unfinished — Cut Requirement in Farm
Reference 31949 · dozer grade left unfinished
- Truck Fill Not Redistributed — Cut Requirement in Irrigation
Reference 31950 · truck fill not redistributed
- Poor Transition Between Grades — Cut Requirement in Civil Site
Reference 31951 · poor transition between grades
- Soil Moisture Condition — Cut Requirement in Road
Reference 31952 · soil moisture condition
- Hard Clay — Cut Requirement in Building Pad
Reference 31953 · hard clay
- Root Interference — Cut Requirement in Industrial Site
Reference 31954 · root interference
- Material Segregation — Cut Requirement in Landscape
Reference 31955 · material segregation
- Settlement After Construction — Cut Requirement in Sports Turf
Reference 31956 · settlement after construction
- Erosion After Rainfall — Cut Requirement in Rural Infrastructure
Reference 31957 · erosion after rainfall
- Flood Scour — Cut Requirement in Rehabilitation
Reference 31958 · flood scour
- Wheel Rutting — Cut Requirement in Public Works
Reference 31959 · wheel rutting
- Road Corrugation Development — Cut Requirement in Renewable Energy
Reference 31960 · road corrugation development
- Topsoil Redistribution Error — Cut Requirement in Farm
Reference 31961 · topsoil redistribution error
- Trench Backfill Settlement — Cut Requirement in Irrigation
Reference 31962 · trench backfill settlement
- Poor Maintenance Timing — Cut Requirement in Civil Site
Reference 31963 · poor maintenance timing
- Surface Not Verified Before Handover — Cut Requirement in Road
Reference 31964 · surface not verified before handover
- Machine Control Setup Error — Cut Requirement in Building Pad
Reference 31965 · machine control setup error
- Survey/Design Mismatch — Cut Requirement in Industrial Site
Reference 31966 · survey/design mismatch
- Wrong Design Elevation — Cut Requirement in Landscape
Reference 31967 · wrong design elevation
- Wrong Benchmark/Reference — Cut Requirement in Sports Turf
Reference 31968 · wrong benchmark/reference
- Excessive Haul Inefficiency — Cut Requirement in Rural Infrastructure
Reference 31969 · excessive haul inefficiency
- Dragging Material Too Far — Cut Requirement in Rehabilitation
Reference 31970 · dragging material too far
- Insufficient Material Carrying — Cut Requirement in Public Works
Reference 31971 · insufficient material carrying
- Repeated Rework Between Trades — Cut Requirement in Renewable Energy
Reference 31972 · repeated rework between trades
- Incorrect Original Grade — Fill Requirement in Farm
Reference 31973 · incorrect original grade
- Insufficient Fall — Fill Requirement in Irrigation
Reference 31974 · insufficient fall
- Excessive Fall — Fill Requirement in Civil Site
Reference 31975 · excessive fall
- Poor Crossfall — Fill Requirement in Road
Reference 31976 · poor crossfall
- Poor Cut Fill Balance — Fill Requirement in Building Pad
Reference 31977 · poor cut fill balance
- Fill Placed In Wrong Location — Fill Requirement in Industrial Site
Reference 31978 · fill placed in wrong location
- Uneven Material Thickness — Fill Requirement in Landscape
Reference 31979 · uneven material thickness
- Inadequate Drainage Path — Fill Requirement in Sports Turf
Reference 31980 · inadequate drainage path
- Blocked Outlet — Fill Requirement in Rural Infrastructure
Reference 31981 · blocked outlet
- Traffic Concentration — Fill Requirement in Rehabilitation
Reference 31982 · traffic concentration
- Construction Sequencing — Fill Requirement in Public Works
Reference 31983 · construction sequencing
- Rough Excavation Left Unfinished — Fill Requirement in Renewable Energy
Reference 31984 · rough excavation left unfinished
- Dozer Grade Left Unfinished — Fill Requirement in Farm
Reference 31985 · dozer grade left unfinished
- Truck Fill Not Redistributed — Fill Requirement in Irrigation
Reference 31986 · truck fill not redistributed
- Poor Transition Between Grades — Fill Requirement in Civil Site
Reference 31987 · poor transition between grades
- Soil Moisture Condition — Fill Requirement in Road
Reference 31988 · soil moisture condition
- Hard Clay — Fill Requirement in Building Pad
Reference 31989 · hard clay
- Root Interference — Fill Requirement in Industrial Site
Reference 31990 · root interference
- Material Segregation — Fill Requirement in Landscape
Reference 31991 · material segregation
- Settlement After Construction — Fill Requirement in Sports Turf
Reference 31992 · settlement after construction
- Erosion After Rainfall — Fill Requirement in Rural Infrastructure
Reference 31993 · erosion after rainfall
- Flood Scour — Fill Requirement in Rehabilitation
Reference 31994 · flood scour
- Wheel Rutting — Fill Requirement in Public Works
Reference 31995 · wheel rutting
- Road Corrugation Development — Fill Requirement in Renewable Energy
Reference 31996 · road corrugation development
- Topsoil Redistribution Error — Fill Requirement in Farm
Reference 31997 · topsoil redistribution error
- Trench Backfill Settlement — Fill Requirement in Irrigation
Reference 31998 · trench backfill settlement
- Poor Maintenance Timing — Fill Requirement in Civil Site
Reference 31999 · poor maintenance timing
- Surface Not Verified Before Handover — Fill Requirement in Road
Reference 32000 · surface not verified before handover
- Cut High Spots — Existing Condition
Reference 32001 · cut high spots
- Cut High Spots — Required Finished Condition
Reference 32002 · cut high spots
- Cut High Spots — Survey Needed
Reference 32003 · cut high spots
- Cut High Spots — Material Volume
Reference 32004 · cut high spots
- Cut High Spots — Haul Distance
Reference 32005 · cut high spots
- Cut High Spots — Machine Before
Reference 32006 · cut high spots
- Cut High Spots — Machine Choice
Reference 32007 · cut high spots
- Cut High Spots — Dugong Role
Reference 32008 · cut high spots
- Cut High Spots — Carry Versus Drag
Reference 32009 · cut high spots