Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Rough Earthworks

Rough earthworks may still contain broad quantity errors, loose fill and unresolved drainage. Fine trimming should begin only after the larger formation is understood.

Before moving material

Survey the bulk surface and identify unsuitable or unaccepted areas.

Receiving operation and checks

Verify the corrected formation before the next layer. Check areas where bulk machines turned, stockpiled or discharged material.

A finish pass cannot establish the suitability of buried fill.

Read the complete Rough Earthworks guide

Earthworks Design

Earthworks design compares existing terrain with the intended surface and accounts for material movement. It must also consider where the resulting water and traffic will go.

Before moving material

Obtain a suitable survey and identify constraints.

Receiving operation and checks

Issue the approved revision and construction checks. Review critical connections and quantity assumptions.

Geometric balance does not establish usable material balance or structural design.

Read the complete Earthworks Design guide

Commercial Landscaping

Commercial landscaping combines finished levels with paths, buildings, trees and drainage. The critical edges often lie at thresholds and connections to hard surfaces rather than in the middle of the landscaped area.

Before moving material

Confirm finished levels and protect services and retained vegetation.

Receiving operation and checks

Install paths, irrigation and planting in the planned order. Check transitions beside structures and the depth of the growing layer.

Do not grade over unlocated services or use unspecified fill beneath load-bearing features.

Read the complete Commercial Landscaping guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group