Indexability Check — Technical Review

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

The Surface Is the Handover

The surface is the handover between operations. An excavator may finish its excavation, but the roller still needs suitable material, lift thickness and moisture. A scraper may finish shaping, but the irrigation operator still needs a connected fall to a usable outlet. Define acceptance at each transition instead of allowing the next machine to inherit an unresolved problem.

Before moving material

Name the operation that receives the surface and agree its requirements.

Receiving operation and checks

Release the area to the next operation only after outstanding defects are identified. Use independent level checks and project-specific material tests where required.

Visual smoothness alone does not prove compaction, bearing capacity or hydraulic performance.

Read the complete The Surface Is the Handover guide

Survey & Verify

Survey and verification compares the delivered surface with the brief before it is covered by the next layer. It should establish both compliant areas and defects.

Before moving material

Agree the acceptance method and reference.

Receiving operation and checks

Record accepted work and required corrections. Check the issued design revision and datum used for comparison.

A level survey cannot prove compaction, and a density test cannot prove grade.

Read the complete Survey & Verify guide

What Verification Evidence Proves

Verification evidence should answer the acceptance question asked. Elevation measurements establish geometry; material records and relevant tests address layer condition. Neither should be silently substituted for the other.

Before moving material

Define the checks needed for the finished purpose.

Receiving operation and checks

Hand over accepted areas and clearly identify exceptions. Check that the evidence concerns the same layer and work zone.

An instrument display is not a complete acceptance record.

Read the complete What Verification Evidence Proves guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group