Chainage — Machine Link for Landscape
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Machine Before - Dugong - Machine After
The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.
Before moving material
Identify the upstream operation and its remaining defects.
Receiving operation and checks
Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.
The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.
Read the complete Machine Before - Dugong - Machine After guideHow to Choose a Land-Grading Machine
Choose a land-grading machine by the actions the job needs: excavation, local dragging, contained carrying, shaping or final trimming. Start with the finished surface and material journey.
Before moving material
Define quantities, access, soil condition and acceptance requirements.
Receiving operation and checks
Verify the same surface outcome regardless of the selected plant. Include mobilisation, operators and downstream machinery in the comparison.
Do not rank every machine by blade width, horsepower or category name alone.
Read the complete How to Choose a Land-Grading Machine guideLandscape Surface Handover
A landscape-surface handover connects soil levels with the intended paths, planting and drainage. The growing layer and structural features need their own acceptance checks.
Before moving material
Confirm finished levels and the planting-medium requirements.
Receiving operation and checks
Hand over to the planting or hardscape team with remaining work identified. Inspect thresholds, tree zones and drainage transitions.
A visual landscape concept is not an issued construction design.
Read the complete Landscape Surface Handover guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.