Project reference 46145

Fine Grade — Machine-Control Example

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

From Rough Grade to Fine Grade

Rough grading establishes the broad shape; fine grading corrects the remaining smaller deviations. Trying to finish while bulk quantities are still wrong can waste passes and disturb completed areas. The changeover should occur when levels are close enough, materials are suitable and the receiving surface is ready for controlled trimming.

Before moving material

Complete major excavation and isolate unsuitable ground.

Receiving operation and checks

Protect the finished area from uncontrolled traffic and schedule the next layer. Check local levels and continuity through joins, not only the average elevation.

Fine grading cannot rescue a weak formation hidden beneath a neat finish.

Read the complete From Rough Grade to Fine Grade guide

Precision Grade Control

Precision grade control is the stage where a reference system is commissioned for the intended surface. It needs design transfer and equipment checks before productive grading.

Before moving material

Confirm design revision, datum and the working-edge reference.

Receiving operation and checks

Verify surface results independently during and after the work. Record calibration and any reference interruptions.

Machine guidance is not acceptance certification.

Read the complete Precision Grade Control guide

GNSS Machine Control

GNSS machine control combines positioning, machine geometry and design information. An accurate receiver position is not automatically an accurate cutting-edge position.

Before moving material

Confirm corrections, sensor arrangement and the coordinate reference.

Receiving operation and checks

Check the completed surface with an independent method. Inspect offsets, design revision and correction status when results disagree.

Compatibility must be confirmed for the actual machine and control installation.

Read the complete GNSS Machine Control guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group