Fuel Use — As-Built Evidence for Landscape
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Landscape Surface Handover
A landscape-surface handover connects soil levels with the intended paths, planting and drainage. The growing layer and structural features need their own acceptance checks.
Before moving material
Confirm finished levels and the planting-medium requirements.
Receiving operation and checks
Hand over to the planting or hardscape team with remaining work identified. Inspect thresholds, tree zones and drainage transitions.
A visual landscape concept is not an issued construction design.
Read the complete Landscape Surface Handover guideWhat Verification Evidence Proves
Verification evidence should answer the acceptance question asked. Elevation measurements establish geometry; material records and relevant tests address layer condition. Neither should be silently substituted for the other.
Before moving material
Define the checks needed for the finished purpose.
Receiving operation and checks
Hand over accepted areas and clearly identify exceptions. Check that the evidence concerns the same layer and work zone.
An instrument display is not a complete acceptance record.
Read the complete What Verification Evidence Proves guideLandscape Contouring
Landscape contouring deliberately shapes the land for function and appearance. The profile still needs to connect to drains, access and retained structures.
Before moving material
Identify design contours, finished levels and protected trees or services.
Receiving operation and checks
Place the growing layer and complete planting or hardscape work. Inspect drainage and transitions around the finished contours.
Do not interpret a visual concept as a construction survey.
Read the complete Landscape Contouring guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.