Project reference 32737

Prepare Corrected Surface For Paving — Machine After

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Machine Before - Dugong - Machine After

The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.

Before moving material

Identify the upstream operation and its remaining defects.

Receiving operation and checks

Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.

The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.

Read the complete Machine Before - Dugong - Machine After guide

Prepare for Compaction

Preparation for compaction ensures that the compactor receives suitable material in the intended layer arrangement. Grading and moisture conditioning must fit the project requirements.

Before moving material

Confirm material, layer depth and compaction method.

Receiving operation and checks

Compact and test according to the brief. Inspect edges and areas inaccessible to the main compaction plant.

There is no single pass count or moisture target suitable for all materials.

Read the complete Prepare for Compaction guide

Prepare for the Next Operation

Preparing for the next operation means identifying what the receiving team needs to start without rework. The handover may need access, layer condition, levels and records.

Before moving material

Ask the next operator or contractor for the required surface condition.

Receiving operation and checks

Hand over the checked area with outstanding items stated. Verify the agreed interface rather than only the grading team's own completion point.

Do not transfer unresolved defects silently to the next trade.

Read the complete Prepare for the Next Operation guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.