Incorrect Fall

Fall is the change in elevation along a defined direction. An incorrect fall can include a reversal, an insufficient gradient or a gradient that differs from the design.

Before moving material

Identify the start and end points, distance and elevation reference.

Receiving operation and checks

Measure the corrected profile independently. Check intermediate points because correct end levels can still hide a local dip.

There is no universal drainage fall appropriate to every project.

Read the complete Incorrect Fall guide

Rough Earthworks

Rough earthworks may still contain broad quantity errors, loose fill and unresolved drainage. Fine trimming should begin only after the larger formation is understood.

Before moving material

Survey the bulk surface and identify unsuitable or unaccepted areas.

Receiving operation and checks

Verify the corrected formation before the next layer. Check areas where bulk machines turned, stockpiled or discharged material.

A finish pass cannot establish the suitability of buried fill.

Read the complete Rough Earthworks guide

Poor Irrigation Surface

An irrigation surface can be poor because of inlet mismatch, local depressions or altered field grade. The correction should follow water observations and measured levels.

Before moving material

Record water movement and survey supply, outlet and field features.

Receiving operation and checks

Recheck levels and observe the next controlled irrigation. Check corners, row ends and the far end of the field.

Grading alone cannot correct an unsuitable water-delivery arrangement.

Read the complete Poor Irrigation Surface guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group