Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

GPS/GNSS Receiver Systems

GPS/GNSS receivers provide position information with different correction arrangements and intended uses. Choose the complete positioning workflow for the task rather than buying a receiver solely by its label.

Before moving material

Confirm vertical requirements, correction service and design integration.

Receiving operation and checks

Verify the actual graded surface. Record correction availability and calibration checks.

General navigation equipment should not be advertised as precision grading equipment without evidence.

Read the complete GPS/GNSS Receiver Systems guide

Dugong + GPS/GNSS Grading

Using Dugong with GPS/GNSS grading requires a complete positioning and implement-reference workflow. Antenna position must be related to the working edge and the issued surface design.

Before moving material

Confirm corrections, datum and the intended control installation.

Receiving operation and checks

Survey or otherwise independently check the resulting grade. Record interruptions and the design revision used.

A tractor's navigation system alone does not establish scraper grade-control capability.

Read the complete Dugong + GPS/GNSS Grading guide

Cut, Collect, Carry, Place & Grade

Cutting, collecting, carrying, placing and grading are different tasks. A machine that drags material forward does not necessarily carry a contained load to a distant low area. Break the earthworks into these actions so the route, implement and checking method match the actual work.

Before moving material

Survey high areas, receiving areas and obstacles before loading.

Receiving operation and checks

Recheck levels before another layer or another operation covers the work. Track the destination of material as well as the appearance of the cut.

Material suitability, safe towing and compaction requirements remain separate decisions.

Read the complete Cut, Collect, Carry, Place & Grade guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group