Project reference 30324

Settlement — Drainage Checks

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Repeated Settlement Diagnosis

Repeated settlement suggests the problem may lie below the visible surface. Filling a depression again can hide a weak or poorly prepared layer.

Before moving material

Record the timing and extent of movement and review material history.

Receiving operation and checks

Repair the confirmed cause and re-establish the intended layers. Monitor the repaired area under the intended use.

A scraper guide cannot diagnose geotechnical failure from a photograph.

Read the complete Repeated Settlement Diagnosis guide

Poor Surface Drainage

Poor surface drainage can result from a blocked outlet, a reversed fall, a damaged crossing or local depressions. Grading should follow the identified cause.

Before moving material

Trace water from its entry point to the receiving outlet.

Receiving operation and checks

Inspect the drainage route during a suitable water event. Check that the complete route remains connected through boundaries and crossings.

Surface grading cannot remedy every subsurface drainage problem.

Read the complete Poor Surface Drainage guide

Drainage Grade Design

Drainage grade design must connect the contributing area to a suitable outlet. Selecting a numerical fall before checking the outlet can produce a surface that cannot discharge as intended.

Before moving material

Survey entry points, structures and the receiving level.

Receiving operation and checks

Inspect the constructed route and its transitions. Check invert continuity and controls at crossings.

This guide does not size drains or establish discharge permissions.

Read the complete Drainage Grade Design guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group