Project reference 24433

How Does Survey Connect To Machine Control — Road Project

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Survey Existing Ground

Surveying existing ground is the first project-stage record of the surface to be changed. Agree the coverage before the survey so critical features are not omitted.

Before moving material

Define boundaries of work, reference control and required detail.

Receiving operation and checks

Issue the survey with datum, units and limitations stated. Check control-point agreement and representation of abrupt terrain changes.

A survey deliverable should not be confused with a legal boundary determination.

Read the complete Survey Existing Ground guide

Precision Grade Control

Precision grade control is the stage where a reference system is commissioned for the intended surface. It needs design transfer and equipment checks before productive grading.

Before moving material

Confirm design revision, datum and the working-edge reference.

Receiving operation and checks

Verify surface results independently during and after the work. Record calibration and any reference interruptions.

Machine guidance is not acceptance certification.

Read the complete Precision Grade Control guide

Survey & Verify

Survey and verification compares the delivered surface with the brief before it is covered by the next layer. It should establish both compliant areas and defects.

Before moving material

Agree the acceptance method and reference.

Receiving operation and checks

Record accepted work and required corrections. Check the issued design revision and datum used for comparison.

A level survey cannot prove compaction, and a density test cannot prove grade.

Read the complete Survey & Verify guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group