Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Design to Dirt

A drawing becomes useful in the field when its levels, coordinates and version are understood by the people and equipment doing the work. A design may be correct while the machine follows the wrong datum or an outdated file. Resolve that transfer before soil moves.

Before moving material

Agree the coordinate system, vertical datum, benchmark and drawing revision.

Receiving operation and checks

Record changes and return the verified surface information to the designer. Retain the issued design and the as-built check as separate records.

Do not infer a surveyed boundary or certified design from an illustrative terrain model.

Read the complete Design to Dirt guide

How Far Does Your Dirt Need to Move?

Haul distance is the distance material must travel from a cut to its actual receiving area. Straight-line map distance can understate the cycle when access, turns and unloading routes matter. Longer hauls increase travel time even when loading capacity is unchanged.

Before moving material

Locate cut and fill areas and inspect the permitted traffic route.

Receiving operation and checks

Choose local balancing, staged stockpiles or another haul method where the route demands it. Use a timed trial with realistic loads and ground conditions.

A theoretical loads-per-hour figure is an operating assumption, not a guaranteed production rate.

Read the complete How Far Does Your Dirt Need to Move? guide

Machine Before - Dugong - Machine After

The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.

Before moving material

Identify the upstream operation and its remaining defects.

Receiving operation and checks

Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.

The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.

Read the complete Machine Before - Dugong - Machine After guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group