Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Road Surface Handover

A road-surface handover should identify the layer being accepted and the next paving or traffic operation. A base-layer check and a wearing-surface check are not interchangeable.

Before moving material

Confirm layer specification, alignment and receiving operation.

Receiving operation and checks

Release the accepted layer to surfacing or the intended use. Check edges, junctions and drainage connections.

The design sets applicable tolerances; the machine brand does not.

Read the complete Road Surface Handover guide

Landscape Surface Handover

A landscape-surface handover connects soil levels with the intended paths, planting and drainage. The growing layer and structural features need their own acceptance checks.

Before moving material

Confirm finished levels and the planting-medium requirements.

Receiving operation and checks

Hand over to the planting or hardscape team with remaining work identified. Inspect thresholds, tree zones and drainage transitions.

A visual landscape concept is not an issued construction design.

Read the complete Landscape Surface Handover guide

Road Formation

Road formation establishes the underlying road shape before base and wearing layers. Correcting it early reduces the chance that later layers must absorb excess thickness variation.

Before moving material

Confirm alignment, grade and the layer sequence.

Receiving operation and checks

Verify and compact before adding the next layer. Check crossfall at intervals and where the alignment changes.

A grader scraper may assist selected sections; larger quantities or long corridors may favour other equipment.

Read the complete Road Formation guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.