Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Drainage Grade Design

Drainage grade design must connect the contributing area to a suitable outlet. Selecting a numerical fall before checking the outlet can produce a surface that cannot discharge as intended.

Before moving material

Survey entry points, structures and the receiving level.

Receiving operation and checks

Inspect the constructed route and its transitions. Check invert continuity and controls at crossings.

This guide does not size drains or establish discharge permissions.

Read the complete Drainage Grade Design guide

Drainage Formation

Drainage formation is the project stage that connects the planned water route through the earthworks. It should be coordinated with structures and crossings.

Before moving material

Set out the drainage profile and receiving outlet.

Receiving operation and checks

Complete erosion protection and inspect the connected route. Measure critical invert and transition levels.

A surface route does not establish drainage capacity or discharge permission.

Read the complete Drainage Formation guide

What Verification Evidence Proves

Verification evidence should answer the acceptance question asked. Elevation measurements establish geometry; material records and relevant tests address layer condition. Neither should be silently substituted for the other.

Before moving material

Define the checks needed for the finished purpose.

Receiving operation and checks

Hand over accepted areas and clearly identify exceptions. Check that the evidence concerns the same layer and work zone.

An instrument display is not a complete acceptance record.

Read the complete What Verification Evidence Proves guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group