Excavation → Paving — Drainage
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
The Surface Is the Handover
The surface is the handover between operations. An excavator may finish its excavation, but the roller still needs suitable material, lift thickness and moisture. A scraper may finish shaping, but the irrigation operator still needs a connected fall to a usable outlet. Define acceptance at each transition instead of allowing the next machine to inherit an unresolved problem.
Before moving material
Name the operation that receives the surface and agree its requirements.
Receiving operation and checks
Release the area to the next operation only after outstanding defects are identified. Use independent level checks and project-specific material tests where required.
Visual smoothness alone does not prove compaction, bearing capacity or hydraulic performance.
Read the complete The Surface Is the Handover guidePoor Surface Drainage
Poor surface drainage can result from a blocked outlet, a reversed fall, a damaged crossing or local depressions. Grading should follow the identified cause.
Before moving material
Trace water from its entry point to the receiving outlet.
Receiving operation and checks
Inspect the drainage route during a suitable water event. Check that the complete route remains connected through boundaries and crossings.
Surface grading cannot remedy every subsurface drainage problem.
Read the complete Poor Surface Drainage guideDrainage Grade Design
Drainage grade design must connect the contributing area to a suitable outlet. Selecting a numerical fall before checking the outlet can produce a surface that cannot discharge as intended.
Before moving material
Survey entry points, structures and the receiving level.
Receiving operation and checks
Inspect the constructed route and its transitions. Check invert continuity and controls at crossings.
This guide does not size drains or establish discharge permissions.
Read the complete Drainage Grade Design guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group