Landscape Soil Placement — Handover From Previous Trade
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Controlled Soil Movement
Controlled soil movement is deliberate placement of suitable material from a defined source to a defined receiving area. The route and load should support that plan.
Before moving material
Identify usable source material and destination levels.
Receiving operation and checks
Grade and prepare the receiving layer. Check the destination and quantity as well as the cut location.
An implement cannot make unsuitable material suitable merely by transporting it.
Read the complete Controlled Soil Movement guideFinished Surface Handover
A finished-surface handover records the surface that has been delivered and the evidence supporting it. It should identify what was checked and what lies outside the grading scope.
Before moving material
Agree the finished purpose and acceptance responsibilities.
Receiving operation and checks
Release the area to use or the next construction stage when accepted. Retain unresolved items and limits alongside the acceptance record.
The term finished should not imply certification beyond the checks actually performed.
Read the complete Finished Surface Handover guideSurvey Existing Ground
Surveying existing ground is the first project-stage record of the surface to be changed. Agree the coverage before the survey so critical features are not omitted.
Before moving material
Define boundaries of work, reference control and required detail.
Receiving operation and checks
Issue the survey with datum, units and limitations stated. Check control-point agreement and representation of abrupt terrain changes.
A survey deliverable should not be confused with a legal boundary determination.
Read the complete Survey Existing Ground guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group