Concept Design — Handover From Previous Trade
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Earthworks Design
Earthworks design compares existing terrain with the intended surface and accounts for material movement. It must also consider where the resulting water and traffic will go.
Before moving material
Obtain a suitable survey and identify constraints.
Receiving operation and checks
Issue the approved revision and construction checks. Review critical connections and quantity assumptions.
Geometric balance does not establish usable material balance or structural design.
Read the complete Earthworks Design guideFinished Surface Handover
A finished-surface handover records the surface that has been delivered and the evidence supporting it. It should identify what was checked and what lies outside the grading scope.
Before moving material
Agree the finished purpose and acceptance responsibilities.
Receiving operation and checks
Release the area to use or the next construction stage when accepted. Retain unresolved items and limits alongside the acceptance record.
The term finished should not imply certification beyond the checks actually performed.
Read the complete Finished Surface Handover guideSurvey Existing Ground
Surveying existing ground is the first project-stage record of the surface to be changed. Agree the coverage before the survey so critical features are not omitted.
Before moving material
Define boundaries of work, reference control and required detail.
Receiving operation and checks
Issue the survey with datum, units and limitations stated. Check control-point agreement and representation of abrupt terrain changes.
A survey deliverable should not be confused with a legal boundary determination.
Read the complete Survey Existing Ground guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group