Site Investigation — Maintenance Implications
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Survey Existing Ground
Surveying existing ground is the first project-stage record of the surface to be changed. Agree the coverage before the survey so critical features are not omitted.
Before moving material
Define boundaries of work, reference control and required detail.
Receiving operation and checks
Issue the survey with datum, units and limitations stated. Check control-point agreement and representation of abrupt terrain changes.
A survey deliverable should not be confused with a legal boundary determination.
Read the complete Survey Existing Ground guideEstablish Required Surface
Establishing the required surface converts a desired use into a construction brief. It should name geometry, layer roles and evidence needed before the next operation.
Before moving material
Identify the receiving operation and relevant design inputs.
Receiving operation and checks
Issue a coordinated brief to the grading and downstream teams. Check interfaces with buildings, roads, drains and neighbouring work.
An illustrative concept is not a construction specification.
Read the complete Establish Required Surface guideEarthworks Design
Earthworks design compares existing terrain with the intended surface and accounts for material movement. It must also consider where the resulting water and traffic will go.
Before moving material
Obtain a suitable survey and identify constraints.
Receiving operation and checks
Issue the approved revision and construction checks. Review critical connections and quantity assumptions.
Geometric balance does not establish usable material balance or structural design.
Read the complete Earthworks Design guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group