High Point — How To Plan Machine Movement

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Machine Before - Dugong - Machine After

The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.

Before moving material

Identify the upstream operation and its remaining defects.

Receiving operation and checks

Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.

The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.

Read the complete Machine Before - Dugong - Machine After guide

High Spots

A high spot is meaningful only relative to the intended surface. It may obstruct runoff, limit cultivation depth or sit above a construction formation. Cutting it without knowing the target can remove useful soil unnecessarily.

Before moving material

Measure the feature against surrounding levels and the agreed datum.

Receiving operation and checks

Recheck the corrected level and restore the appropriate surface layer. Check whether the high spot was a local deposit or part of the intended contour.

A visible mound is not automatically a defect.

Read the complete High Spots guide

Surveying for Land Grading

Surveying for grading establishes the relationship between the site and the intended surface. Machine guidance can assist work, but the survey determines the reference against which results are checked.

Before moving material

Define the survey area, control and required deliverables.

Receiving operation and checks

Use the survey to prepare the design and later acceptance checks. Retain the datum, units and control-point descriptions.

A topographic survey and a legal boundary survey serve different purposes.

Read the complete Surveying for Land Grading guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group