Project reference 16560

Grading Plan — How To Set Grade

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Drainage Grade Design

Drainage grade design must connect the contributing area to a suitable outlet. Selecting a numerical fall before checking the outlet can produce a surface that cannot discharge as intended.

Before moving material

Survey entry points, structures and the receiving level.

Receiving operation and checks

Inspect the constructed route and its transitions. Check invert continuity and controls at crossings.

This guide does not size drains or establish discharge permissions.

Read the complete Drainage Grade Design guide

Irrigation Grade Design

Irrigation grade design starts with the method of applying water and the field's soil and supply conditions. Minimising unnecessary soil movement is one consideration alongside water distribution.

Before moving material

Survey the field with inlet and outlet structures.

Receiving operation and checks

Check the formed field and its operating behaviour. Record levels and water observations together.

A single published slope cannot replace site-specific irrigation design.

Read the complete Irrigation Grade Design guide

Cut, Collect, Carry, Place & Grade

Cutting, collecting, carrying, placing and grading are different tasks. A machine that drags material forward does not necessarily carry a contained load to a distant low area. Break the earthworks into these actions so the route, implement and checking method match the actual work.

Before moving material

Survey high areas, receiving areas and obstacles before loading.

Receiving operation and checks

Recheck levels before another layer or another operation covers the work. Track the destination of material as well as the appearance of the cut.

Material suitability, safe towing and compaction requirements remain separate decisions.

Read the complete Cut, Collect, Carry, Place & Grade guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group