Digital Terrain Model — How To Plan Drainage
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Digital Terrain Models
A digital terrain model represents a surface from measured or designed data. It can guide cut-and-fill calculations, but poor boundaries and missing breaklines can create a misleading model.
Before moving material
Confirm data source, coordinate system and model extent.
Receiving operation and checks
Issue a controlled design model for the intended workflow. Compare selected model elevations with known field observations.
A model image is not proof of survey accuracy or a certified design.
Read the complete Digital Terrain Models guideDrainage Grade Design
Drainage grade design must connect the contributing area to a suitable outlet. Selecting a numerical fall before checking the outlet can produce a surface that cannot discharge as intended.
Before moving material
Survey entry points, structures and the receiving level.
Receiving operation and checks
Inspect the constructed route and its transitions. Check invert continuity and controls at crossings.
This guide does not size drains or establish discharge permissions.
Read the complete Drainage Grade Design guidePoor Surface Drainage
Poor surface drainage can result from a blocked outlet, a reversed fall, a damaged crossing or local depressions. Grading should follow the identified cause.
Before moving material
Trace water from its entry point to the receiving outlet.
Receiving operation and checks
Inspect the drainage route during a suitable water event. Check that the complete route remains connected through boundaries and crossings.
Surface grading cannot remedy every subsurface drainage problem.
Read the complete Poor Surface Drainage guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.