Digital Terrain Model — How To Identify High And Low Areas

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Digital Terrain Models

A digital terrain model represents a surface from measured or designed data. It can guide cut-and-fill calculations, but poor boundaries and missing breaklines can create a misleading model.

Before moving material

Confirm data source, coordinate system and model extent.

Receiving operation and checks

Issue a controlled design model for the intended workflow. Compare selected model elevations with known field observations.

A model image is not proof of survey accuracy or a certified design.

Read the complete Digital Terrain Models guide

High-to-Low Redistribution

High-to-low redistribution can reduce local quantity imbalance when the high area's material suits the low area's intended use. It should follow measured levels, not visual guesses.

Before moving material

Mark confirmed cut and fill areas and soil layers.

Receiving operation and checks

Prepare the placed material and recheck the profile. Compare productive-layer depth in both source and receiving zones.

Some low areas are designed drains and should not be filled.

Read the complete High-to-Low Redistribution guide

How to Move Soil From High Spots to Low Spots

Moving soil from high spots to low spots requires a measured surplus and a suitable receiving area. A low patch caused by weak support may need repair before fill.

Before moving material

Check source material and the low area's cause.

Receiving operation and checks

Prepare the receiving layer and restore the source surface. Check both final levels and soil-layer depth.

Avoid filling designed drains or mixing unsuitable subsoil into growing medium.

Read the complete How to Move Soil From High Spots to Low Spots guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group