Project reference 16351

Existing Surface Model — How To Set Grade

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Existing-Surface Survey

An existing-surface survey records what is present before soil moves. Omitting a drain edge, bank or abrupt grade change can distort the volume model even when point readings are correct.

Before moving material

Identify the work extent and important surface features.

Receiving operation and checks

Compare the surveyed surface with the proposed design. Inspect coverage and gaps rather than relying only on a coloured map.

Survey spacing must reflect terrain and required precision, not a universal grid size.

Read the complete Existing-Surface Survey guide

Drainage Grade Design

Drainage grade design must connect the contributing area to a suitable outlet. Selecting a numerical fall before checking the outlet can produce a surface that cannot discharge as intended.

Before moving material

Survey entry points, structures and the receiving level.

Receiving operation and checks

Inspect the constructed route and its transitions. Check invert continuity and controls at crossings.

This guide does not size drains or establish discharge permissions.

Read the complete Drainage Grade Design guide

Irrigation Grade Design

Irrigation grade design starts with the method of applying water and the field's soil and supply conditions. Minimising unnecessary soil movement is one consideration alongside water distribution.

Before moving material

Survey the field with inlet and outlet structures.

Receiving operation and checks

Check the formed field and its operating behaviour. Record levels and water observations together.

A single published slope cannot replace site-specific irrigation design.

Read the complete Irrigation Grade Design guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group