As-Constructed Survey — Material Movement
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Rough Earthworks
Rough earthworks may still contain broad quantity errors, loose fill and unresolved drainage. Fine trimming should begin only after the larger formation is understood.
Before moving material
Survey the bulk surface and identify unsuitable or unaccepted areas.
Receiving operation and checks
Verify the corrected formation before the next layer. Check areas where bulk machines turned, stockpiled or discharged material.
A finish pass cannot establish the suitability of buried fill.
Read the complete Rough Earthworks guideMaterial Stockpiles
A stockpile is a temporary material store, not necessarily a ready-to-use grading supply. Segregation, contamination and mixed layers can develop while material is stored.
Before moving material
Identify the stockpile contents and approved use.
Receiving operation and checks
Grade the receiving area and remove temporary obstructions when appropriate. Check material condition and receiving quantities.
A compact scraper may be useful for placement but not for every stockpile loading task.
Read the complete Material Stockpiles guideSurveying for Land Grading
Surveying for grading establishes the relationship between the site and the intended surface. Machine guidance can assist work, but the survey determines the reference against which results are checked.
Before moving material
Define the survey area, control and required deliverables.
Receiving operation and checks
Use the survey to prepare the design and later acceptance checks. Retain the datum, units and control-point descriptions.
A topographic survey and a legal boundary survey serve different purposes.
Read the complete Surveying for Land Grading guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group