Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Subgrade Preparation

Subgrade preparation creates the surface that supports the next pavement or structural layer. The visible level and the condition of the material both matter.

Before moving material

Remove unsuitable material according to the project instructions and establish the formation reference.

Receiving operation and checks

Prepare for the specified compaction and acceptance process. Check levels, moisture and soft areas before the next layer is placed.

A geometric check cannot replace material testing.

Read the complete Subgrade Preparation guide

Rough Earthworks

Rough earthworks may still contain broad quantity errors, loose fill and unresolved drainage. Fine trimming should begin only after the larger formation is understood.

Before moving material

Survey the bulk surface and identify unsuitable or unaccepted areas.

Receiving operation and checks

Verify the corrected formation before the next layer. Check areas where bulk machines turned, stockpiled or discharged material.

A finish pass cannot establish the suitability of buried fill.

Read the complete Rough Earthworks guide

Uneven Subgrade

Uneven subgrade can create variable thickness in every layer above it. Correcting the surface is useful only if the underlying support is acceptable.

Before moving material

Identify soft areas and compare formation levels with design.

Receiving operation and checks

Complete compaction and specified acceptance checks. Check levels before base material conceals the subgrade.

A scraper does not replace proof testing or project-specific investigation.

Read the complete Uneven Subgrade guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group