Project reference 15464

Landscape Architect — Turf Handover

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Finished Surface Handover

A finished-surface handover records the surface that has been delivered and the evidence supporting it. It should identify what was checked and what lies outside the grading scope.

Before moving material

Agree the finished purpose and acceptance responsibilities.

Receiving operation and checks

Release the area to use or the next construction stage when accepted. Retain unresolved items and limits alongside the acceptance record.

The term finished should not imply certification beyond the checks actually performed.

Read the complete Finished Surface Handover guide

Landscape Surface Handover

A landscape-surface handover connects soil levels with the intended paths, planting and drainage. The growing layer and structural features need their own acceptance checks.

Before moving material

Confirm finished levels and the planting-medium requirements.

Receiving operation and checks

Hand over to the planting or hardscape team with remaining work identified. Inspect thresholds, tree zones and drainage transitions.

A visual landscape concept is not an issued construction design.

Read the complete Landscape Surface Handover guide

Sports Turf Surface Handover

A sports-turf handover should identify the formation, drainage and growing-layer system delivered. Playing-surface appearance alone does not establish venue acceptance.

Before moving material

Obtain the applicable project and sport requirements.

Receiving operation and checks

Complete the venue's inspection and release process. Retain measured levels and relevant construction records.

No sport or venue compliance is claimed from illustration or grading alone.

Read the complete Sports Turf Surface Handover guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group