ปรับระดับดิน — ฟื้นฟูพื้นที่: handover
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Machine Before - Dugong - Machine After
The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.
Before moving material
Identify the upstream operation and its remaining defects.
Receiving operation and checks
Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.
The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.
Read the complete Machine Before - Dugong - Machine After guideThe Surface Is the Handover
The surface is the handover between operations. An excavator may finish its excavation, but the roller still needs suitable material, lift thickness and moisture. A scraper may finish shaping, but the irrigation operator still needs a connected fall to a usable outlet. Define acceptance at each transition instead of allowing the next machine to inherit an unresolved problem.
Before moving material
Name the operation that receives the surface and agree its requirements.
Receiving operation and checks
Release the area to the next operation only after outstanding defects are identified. Use independent level checks and project-specific material tests where required.
Visual smoothness alone does not prove compaction, bearing capacity or hydraulic performance.
Read the complete The Surface Is the Handover guideFinished Surface Handover
A finished-surface handover records the surface that has been delivered and the evidence supporting it. It should identify what was checked and what lies outside the grading scope.
Before moving material
Agree the finished purpose and acceptance responsibilities.
Receiving operation and checks
Release the area to use or the next construction stage when accepted. Retain unresolved items and limits alongside the acceptance record.
The term finished should not imply certification beyond the checks actually performed.
Read the complete Finished Surface Handover guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group