Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

How to Prepare Subgrade for Road Base

Before road base is placed, the subgrade should be accepted for both level and condition. An uneven or weak supporting surface can lead to thickness variation and premature failure above it.

Before moving material

Confirm formation level and identify unaccepted areas.

Receiving operation and checks

Inspect and accept before spreading base aggregate. Record level and material checks for the same work area.

Adding more base material is not automatically a remedy for weak subgrade.

Read the complete How to Prepare Subgrade for Road Base guide

How to Prepare Soil for Turf

Preparing soil for turf starts below the visible grass. Accept the formation, place the specified growing medium and then create the final planting condition.

Before moving material

Confirm layer arrangement, drainage and soil requirements.

Receiving operation and checks

Complete seedbed preparation, irrigation and turf installation. Check low spots and growing-layer thickness before covering the soil.

Grading alone does not establish agronomic suitability.

Read the complete How to Prepare Soil for Turf guide

Global Land Grading Knowledge Centre

The knowledge centre connects four decisions: the finished purpose, the problem stopping it, the work needed to correct it, and the equipment that can perform that work. Start with the symptom or project rather than a machine name when the cause is uncertain.

Before moving material

Choose a design, application or equipment pathway.

Receiving operation and checks

Take a clear project brief to the person arranging design or rental. Compare the selected guide with the actual site conditions.

Country or town names do not establish a local branch, completed project or available rental machine.

Read the complete Global Land Grading Knowledge Centre guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group