Incorrect Fall — Machine-Before Issue
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Machine Before - Dugong - Machine After
The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.
Before moving material
Identify the upstream operation and its remaining defects.
Receiving operation and checks
Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.
The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.
Read the complete Machine Before - Dugong - Machine After guideIncorrect Fall
Fall is the change in elevation along a defined direction. An incorrect fall can include a reversal, an insufficient gradient or a gradient that differs from the design.
Before moving material
Identify the start and end points, distance and elevation reference.
Receiving operation and checks
Measure the corrected profile independently. Check intermediate points because correct end levels can still hide a local dip.
There is no universal drainage fall appropriate to every project.
Read the complete Incorrect Fall guideIncorrect Crossfall
Crossfall controls the change in level across a road, path or other surface. A correct centreline does not prove that the edges drain correctly.
Before moving material
Measure the cross-section at the affected location.
Receiving operation and checks
Check the corrected section and the neighbouring transition sections. Verify both edges and any gutter or drain connection.
Do not infer a road crossfall specification from a generic illustration.
Read the complete Incorrect Crossfall guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group