Drainage Design — Machine Compatibility

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Drainage Grade Design

Drainage grade design must connect the contributing area to a suitable outlet. Selecting a numerical fall before checking the outlet can produce a surface that cannot discharge as intended.

Before moving material

Survey entry points, structures and the receiving level.

Receiving operation and checks

Inspect the constructed route and its transitions. Check invert continuity and controls at crossings.

This guide does not size drains or establish discharge permissions.

Read the complete Drainage Grade Design guide

Transport Lockouts and Machine State

Transport lockouts and parked-machine arrangements should follow the supplied machine instructions. A hydraulic control position should not be treated as an unspecified mechanical transport restraint.

Before moving material

Identify the actual locking and isolation arrangements.

Receiving operation and checks

Use the transport company's agreed loading and restraint process. Check that the machine is in its specified transport state.

This guide does not design a restraint system or replace the machine manual.

Read the complete Transport Lockouts and Machine State guide

Design to Dirt

A drawing becomes useful in the field when its levels, coordinates and version are understood by the people and equipment doing the work. A design may be correct while the machine follows the wrong datum or an outdated file. Resolve that transfer before soil moves.

Before moving material

Agree the coordinate system, vertical datum, benchmark and drawing revision.

Receiving operation and checks

Record changes and return the verified surface information to the designer. Retain the issued design and the as-built check as separate records.

Do not infer a surveyed boundary or certified design from an illustrative terrain model.

Read the complete Design to Dirt guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.