Grade Sensor — Workflow
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Precision Grade Control
Precision grade control is the stage where a reference system is commissioned for the intended surface. It needs design transfer and equipment checks before productive grading.
Before moving material
Confirm design revision, datum and the working-edge reference.
Receiving operation and checks
Verify surface results independently during and after the work. Record calibration and any reference interruptions.
Machine guidance is not acceptance certification.
Read the complete Precision Grade Control guideCut, Collect, Carry, Place & Grade
Cutting, collecting, carrying, placing and grading are different tasks. A machine that drags material forward does not necessarily carry a contained load to a distant low area. Break the earthworks into these actions so the route, implement and checking method match the actual work.
Before moving material
Survey high areas, receiving areas and obstacles before loading.
Receiving operation and checks
Recheck levels before another layer or another operation covers the work. Track the destination of material as well as the appearance of the cut.
Material suitability, safe towing and compaction requirements remain separate decisions.
Read the complete Cut, Collect, Carry, Place & Grade guideFrom Rough Grade to Fine Grade
Rough grading establishes the broad shape; fine grading corrects the remaining smaller deviations. Trying to finish while bulk quantities are still wrong can waste passes and disturb completed areas. The changeover should occur when levels are close enough, materials are suitable and the receiving surface is ready for controlled trimming.
Before moving material
Complete major excavation and isolate unsuitable ground.
Receiving operation and checks
Protect the finished area from uncontrolled traffic and schedule the next layer. Check local levels and continuity through joins, not only the average elevation.
Fine grading cannot rescue a weak formation hidden beneath a neat finish.
Read the complete From Rough Grade to Fine Grade guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group