Project reference 04775

What machine should grade after a bulldozer — Irrigation Project

Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Machine Before - Dugong - Machine After

The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.

Before moving material

Identify the upstream operation and its remaining defects.

Receiving operation and checks

Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.

The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.

Read the complete Machine Before - Dugong - Machine After guide

Irrigation Grade Design

Irrigation grade design starts with the method of applying water and the field's soil and supply conditions. Minimising unnecessary soil movement is one consideration alongside water distribution.

Before moving material

Survey the field with inlet and outlet structures.

Receiving operation and checks

Check the formed field and its operating behaviour. Record levels and water observations together.

A single published slope cannot replace site-specific irrigation design.

Read the complete Irrigation Grade Design guide

Precision Grade Control

Precision grade control is the stage where a reference system is commissioned for the intended surface. It needs design transfer and equipment checks before productive grading.

Before moving material

Confirm design revision, datum and the working-edge reference.

Receiving operation and checks

Verify surface results independently during and after the work. Record calibration and any reference interruptions.

Machine guidance is not acceptance certification.

Read the complete Precision Grade Control guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.