Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Compaction Preparation

Compaction preparation concerns material condition, layer thickness and access as well as grade. A roller cannot reliably correct poorly placed or unsuitable fill merely by making more passes.

Before moving material

Obtain the project's material and compaction requirements.

Receiving operation and checks

Use the appropriate compactor and testing procedure. Check that the layer remains continuous and accessible for the compaction plant.

There is no universal pass count or density target for every material.

Read the complete Compaction Preparation guide

The Surface Is the Handover

The surface is the handover between operations. An excavator may finish its excavation, but the roller still needs suitable material, lift thickness and moisture. A scraper may finish shaping, but the irrigation operator still needs a connected fall to a usable outlet. Define acceptance at each transition instead of allowing the next machine to inherit an unresolved problem.

Before moving material

Name the operation that receives the surface and agree its requirements.

Receiving operation and checks

Release the area to the next operation only after outstanding defects are identified. Use independent level checks and project-specific material tests where required.

Visual smoothness alone does not prove compaction, bearing capacity or hydraulic performance.

Read the complete The Surface Is the Handover guide

Crushed-Rock Preparation

Crushed-rock preparation concerns a specified material layer. Its grading, moisture and compaction requirements belong to the project brief, not merely the machine placing it.

Before moving material

Confirm material documents and supporting-layer acceptance.

Receiving operation and checks

Complete the specified testing and surface acceptance. Check material uniformity and layer depth.

A scraper's capacity cannot establish the compacted thickness achieved.

Read the complete Crushed-Rock Preparation guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.