Compacted Soil

Compacted soil is not always defective: compaction may be desirable beneath a road and undesirable in a growing zone. Decide which purpose the soil serves before attempting to loosen it.

Before moving material

Identify the required use and investigate the affected layer.

Receiving operation and checks

Use the appropriate cultivation or compaction method after grading. Check the relevant soil or engineering evidence rather than surface appearance.

A scraper does not measure density or establish root-zone condition.

Read the complete Compacted Soil guide

Clay Soil Grading

Clay grading depends strongly on working condition. Material that is too dry can resist cutting and form clods; material that is too wet can smear, rut and lose its intended shape.

Before moving material

Assess the clay and the required layer before choosing the working window.

Receiving operation and checks

Prepare for the specified cultivation or compaction operation. Watch for rutting, smearing and large buried clods.

The useful moisture condition depends on the soil and task; no universal percentage is specified.

Read the complete Clay Soil Grading guide

Loam Soil Grading

Loam grading should protect the productive surface while correcting the broad level relationship. Soil classification alone does not establish that a particular layer is suitable structural fill.

Before moving material

Record layer depth and the receiving use.

Receiving operation and checks

Restore cultivation or growing-surface preparation. Check topsoil depth and remaining drainage depressions.

Structural use needs the relevant material assessment rather than an informal soil description.

Read the complete Loam Soil Grading guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.