Find the Machine Before
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Machine Before - Dugong - Machine After
The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.
Before moving material
Identify the upstream operation and its remaining defects.
Receiving operation and checks
Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.
The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.
Read the complete Machine Before - Dugong - Machine After guideGlobal Land Grading Knowledge Centre
The knowledge centre connects four decisions: the finished purpose, the problem stopping it, the work needed to correct it, and the equipment that can perform that work. Start with the symptom or project rather than a machine name when the cause is uncertain.
Before moving material
Choose a design, application or equipment pathway.
Receiving operation and checks
Take a clear project brief to the person arranging design or rental. Compare the selected guide with the actual site conditions.
Country or town names do not establish a local branch, completed project or available rental machine.
Read the complete Global Land Grading Knowledge Centre guideHow to Grade Before Asphalt
Grading before asphalt should establish the correct supporting profile and allow for the specified surfacing thickness. Resolve drainage and transition errors before paving.
Before moving material
Confirm the supporting-layer acceptance and finished elevations.
Receiving operation and checks
Hand over to the asphalt contractor with level and acceptance records. Check joints, gutters and connections to existing pavement.
Asphalt placement should not be presented as a function of the scraper.
Read the complete How to Grade Before Asphalt guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group