Digital Design to Physical Grade
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Drainage Grade Design
Drainage grade design must connect the contributing area to a suitable outlet. Selecting a numerical fall before checking the outlet can produce a surface that cannot discharge as intended.
Before moving material
Survey entry points, structures and the receiving level.
Receiving operation and checks
Inspect the constructed route and its transitions. Check invert continuity and controls at crossings.
This guide does not size drains or establish discharge permissions.
Read the complete Drainage Grade Design guideIrrigation Grade Design
Irrigation grade design starts with the method of applying water and the field's soil and supply conditions. Minimising unnecessary soil movement is one consideration alongside water distribution.
Before moving material
Survey the field with inlet and outlet structures.
Receiving operation and checks
Check the formed field and its operating behaviour. Record levels and water observations together.
A single published slope cannot replace site-specific irrigation design.
Read the complete Irrigation Grade Design guideHow to Grade Before Asphalt
Grading before asphalt should establish the correct supporting profile and allow for the specified surfacing thickness. Resolve drainage and transition errors before paving.
Before moving material
Confirm the supporting-layer acceptance and finished elevations.
Receiving operation and checks
Hand over to the asphalt contractor with level and acceptance records. Check joints, gutters and connections to existing pavement.
Asphalt placement should not be presented as a function of the scraper.
Read the complete How to Grade Before Asphalt guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology