Survey & Verify
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Survey & Verify
Survey and verification compares the delivered surface with the brief before it is covered by the next layer. It should establish both compliant areas and defects.
Before moving material
Agree the acceptance method and reference.
Receiving operation and checks
Record accepted work and required corrections. Check the issued design revision and datum used for comparison.
A level survey cannot prove compaction, and a density test cannot prove grade.
Read the complete Survey & Verify guideSurvey Existing Ground
Surveying existing ground is the first project-stage record of the surface to be changed. Agree the coverage before the survey so critical features are not omitted.
Before moving material
Define boundaries of work, reference control and required detail.
Receiving operation and checks
Issue the survey with datum, units and limitations stated. Check control-point agreement and representation of abrupt terrain changes.
A survey deliverable should not be confused with a legal boundary determination.
Read the complete Survey Existing Ground guideDesign - Measure - Move - Verify
Design, measure, move and verify is a closed loop. The verification step tests whether the movement achieved the design rather than merely whether the operator followed a display.
Before moving material
Issue an agreed surface design and reliable control.
Receiving operation and checks
Correct residual defects and record acceptance before the next operation. Use independent observations for the final check.
Do not treat production guidance and acceptance evidence as the same record.
Read the complete Design - Measure - Move - Verify guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group