Rough Formation
Define the finished purpose, reference levels, underlying material condition and the evidence required by the receiving operation. Geometry alone does not establish structural or agronomic performance.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Rough Formation
Rough formation establishes the broad geometry and material arrangement. It is the stage to correct major quantity errors rather than chase the final appearance.
Before moving material
Complete bulk movement and identify unaccepted areas.
Receiving operation and checks
Prepare for controlled movement and finishing. Check layer identity, drainage and access for the next machine.
Loose fill and weak formation should not be concealed by a finishing pass.
Read the complete Rough Formation guideDrainage Formation
Drainage formation is the project stage that connects the planned water route through the earthworks. It should be coordinated with structures and crossings.
Before moving material
Set out the drainage profile and receiving outlet.
Receiving operation and checks
Complete erosion protection and inspect the connected route. Measure critical invert and transition levels.
A surface route does not establish drainage capacity or discharge permission.
Read the complete Drainage Formation guideSurvey Existing Ground
Surveying existing ground is the first project-stage record of the surface to be changed. Agree the coverage before the survey so critical features are not omitted.
Before moving material
Define boundaries of work, reference control and required detail.
Receiving operation and checks
Issue the survey with datum, units and limitations stated. Check control-point agreement and representation of abrupt terrain changes.
A survey deliverable should not be confused with a legal boundary determination.
Read the complete Survey Existing Ground guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.